Abstract
Leading indicators have been widely used in general business forecasting situations, but only rarely in a tourism context. In this study leading indicator transfer function (TF) models are developed to generate forecasts of international tourism demand from the UK to six major destinations. The out-of-sample forecasting accuracy is compared with the accuracy of forecasts generated by univariate ARIMA and error correction models (ECMs). The inclusion of a causal input within an ARIMA time series framework (TF model) does not result in an improvement in forecasting performance. The time series models outperform the ECM for short-term forecasting, but the ECM generates more accurate longer-term forecasts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.