Abstract

The goal was to monitor the effectiveness of the Coast Guard Yard's lead program by comparing a shipyard period in 1991 to one in 2002-2003. Comparisons of airborne lead levels by paint removal techniques, airborne lead levels by welding techniques, and blood lead levels of workers were evaluated by chi2 analysis. Airborne lead levels in paint removal techniques decreased over time for all methods used. Airborne lead levels in welding techniques decreased over time for all methods used. Blood lead levels of the high-risk group revealed a 2-fold reduction (prevalence rate ratio = 8.3; 95% confidence interval, 3.7-18.6) and in the low-risk group revealed a 1.6-fold reduction (prevalence rate ratio = 6.2; 95% confidence interval, 0.86-44.7). The Coast Guard Yard runs an effective lead program that exceeds the national Healthy People 2010 goal for lead. The results validate the Coast Guard Yard's use of air-line respirators and lead-free paint on all vessels.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.