Abstract

Leaching tests are fundamental tools for the assessment of long-term impact of contaminated waste materials on the soil-groundwater pathway. Experiments were carried out in the framework of standardization and validation of column percolation and batch test procedures, in particular concerning the stipulation of the experimental setup. The colloid release of column and batch experiments was compared and the influence of different column filling heights (12.5–50cm) on the release of polycyclic aromatic hydrocarbons (PAH) from soil was studied, as well as the effect of varying contact times (2.5–16h) on the release of chromium from construction and demolition (C&D) waste and municipal solid waste incineration (MSWI) bottom ash. The results indicate that filtration of the eluate, which is required for batch tests, does not always allow the simulation of the actual colloid amount in soil pore water. Medium column heights four times the inner diameter of the column seemed to provide reasonable equilibrium adjustment conditions and avoid major biodegradation. The release of chromium was only marginally affected by the contact time, varied between 0.115 and 0.150mg/kg for demolition waste eluate at a liquid-to-solid ratio of approximately 5L/kg.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.