Abstract

Solidified sludge undergoes progressive depletion of the alkalinity materials under natural weathering condition and releases out of heavy metals. The leaching of heavy metals from solidified sewage sludge was studied by acid neutralization capacity (ANC) test and flow-through leaching test. The results of ANC test showed that heavy metals release at high concentration when the pH of extract lowers than 6. The disintegration of solidified sludge and the transformation of heavy metals are the main reasons for the resolubilisation of contaminants. Flow-through leaching test indicated that leaching of heavy metals from solidified sludge occurs in a slow way. A mathematical model has been developed to predict the stabilization time of heavy metals in solidified sludge. The research results showed that decreasing hydraulic conductivity is more important than cement addition for controlling the release of heavy metals from solidified sludge.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.