Abstract
PurposeThis paper aims to investigate the statistical validity of geotechnical risk factors in accounting for cost overruns in highway projects. The study hypothesises that “latent pathogens” because of mismanaged geotechnical risk, which lay dormant in organisational practices of highway agencies, trigger cost overruns.Design/methodology/approachTo test this hypothesis, cost and geotechnical data gathered for 61 completed highway projects, executed in the Niger Delta, recording unusually high cost overruns, along with qualitative data from 16 interviews with the project commissioners, were comprehensively analysed via regression modelling, to statistically explain recorded cost variance.FindingsThe results provide empirical evidence supporting a cause–effect relationship between the extent of cost overrun and key geotechnical factors. It is suggested that positive changes made in the geotechnical practices of the highway agencies will produce an expected exponential decrease in the level of cost overruns recorded in highway projects.Research limitations/implicationsThe study is limited to explaining the propagation of unusually high cost overruns in the geologic setting of the Niger Delta region of Nigeria. As such there is a need to test the generalisability of the theory presented.Practical implicationsThe emergent view of geotechnical practice calls for further research, necessary to align geotechnical best practice into highway project delivery in the Niger Delta region.Originality/valueThe study used a robust methodological approach to understanding the propagation of cost overruns in highway projects, based on a characterisation of geotechnical intricacies, which is unprecedented in cost overrun research.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have