Abstract

Little has been written concerning problems that can be encountered in, or compounded by, installing large volume, high-horsepower submersible pumping equipment in water source wells in the range of 30,000 to 90,000 BWPD at 320 to 1,020 hp. This report addresses many problems of the past 12 years in Shell Oil Co.'s west Texas water supply system and the solutions that subsequently were applied. We feel that the majority of these problems are encountered in almost any project of this type. Motor, pump, and protector anomalies, accessory equipment, surface production facilities, and the protective schemes to optimize equipment life are discussed in detail.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.