Abstract

This article examines the environmental and socioeconomic consequences of hydraulic infrastructural changes along the Senegal River valley and estuary. During the 1980s, two dams were built along the valley floor to facilitate hydroelectrical production and regular water supply for crop irrigation. In 2003, a breach was dug across Barbary Spit to alleviate flooding in the nearby Saint-Louis city. Although these structures helped regulate the river flow, they also resulted in a series of unforeseen impacts. The study examines these, after on-site measurements (topometry, water salinity, piezometry), analysis of hydrological data, field observations, and surveys with dam managers, state regional directions, and local stakeholders. It stresses the urgency of elaborating models of hydraulic management to limit the negative consequences of the hydraulic constructions. These models should consider the variety of water uses in the middle valley and delta, and also the water safety and quality (salinity) downriver from Diama Dam.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.