Abstract
The reclamation project establishes general requirements for the implementation of work on the reclamation of a land plot. The implementation of such work will lead to the restoration of soil cover throughout the entire territory of the reclaimed area, in which the processes of natural soil functioning can occur. The relevance of the topic is due to the fact that the reclamation project considers the development of measures aimed at optimizing the physical and chemical conditions of the environment, increasing the resistance of soils to various influences. The object of the study is the land plot of the filtration fields of JSC BZLK Citrobel, located in the western industrial region of Belgorod. The purpose of the work is to design and develop measures for the reclamation of lands disturbed as a result of the construction and operation of filtration fields of JSC BZLK Citrobel. The article examines the technical stage of reclamation, where the total area of the land plot was determined and the volume of movement of earth masses was calculated. Then the issue of the biological stage of land reclamation was considered, proposals and recommendations for its implementation were given. It is recommended to take into account the volume of excavation work taking into account the existing terrain and modern work technologies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.