Abstract

Three lamella settlers were monitored over a period of 4 years. The main objective was to determine removal efficiencies for total suspended solids and associated pollutants. For this purpose a new sampling method based on large volume solid samplers was developed allowing a detailed analysis of solids. With regard to total suspended solids the average removal efficiency of the plants range from 49 to 68%. Similar values could be achieved for phosphorus and heavy metals mainly because of the high portion of fine particles in treatment plants' influent. A clear dependency between solid removal efficiency and the parameters maximum surface load and influent concentration could be observed on a single event basis. The aggregation of all findings result in a recommended maximum design surface loading rate (SLR) of 4 m/h. A solid removal rate of 50%, which is defined as minimum long-term efficiency, can be achieved safely at this SLR. In addition to the definition of the maximum SLR, a proper dissipation of the inflow energy and an equal collection of the clear water above the lamellas turn out to be essential.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call