Abstract

Frequent delays will be experienced in the start-up of molten steel on the converter equipment during the steelmaking–continuous casting (SCC) production process due to the untimely supply of molten iron or scrap, which may cause conflicts between adjacent heat on the same equipment or in the same casting. The casting machine is cut off, resulting in the failure of the static scheduling plan. SCC production ladle re-scheduling is based on the premise that the production process path remains unchanged, the operation of adjacent heat on the converter and refining furnace does not conflict, and the casting of adjacent heat within the same casting is continuous. The ladle re-scheduling of steelmaking and continuous casting production aims at continuously casting many charges with the same cast and avoiding conflicts of adjacent charges on the same machine. This mechanism proposes a method of ladle re-scheduling in the production process of steelmaking–refining–continuous casting, which is divided into two parts: plan re-scheduling and ladle optimisation scheduling. Firstly, a re-scheduling optimisation model of the steelmaking and continuous casting production is built. This model aims at minimising the waiting time of all charges. The re-scheduling strategy of steelmaking and continuous casting production is proposed by interval processing time of charges and scheduling expert experience. This strategy is composed of two parts: re-scheduling charge decision and charge processing machine decision. Then, the first-order rule learning is used to select the optimisation target to establish the ladle optimal scheduling model. The ladle matching rules are extracted on the basis of the rule reasoning of the minimum general generalisation. The ladle optimisation scheduling method that consists of the optimal selection of the ladle and the preparation of the optimal path of the ladle is proposed. Ladle selection is based on the production process and adopts rule-based reasoning to select decarburised ladle after choosing dephosphorised ladle. Ladle path preparation, which is a multi-priority heuristic method, is designed to decide the path of the ladle from the converter to the refining furnace to the continuous casting machine. Finally, this mechanism was actually verified based on the large-scale data of a steel company in Shanghai, China. Results showed that the production efficiency of steelmaking-refining-continuous casting was improved.

Highlights

  • Modern steelmaking and continuous casting production are composed of multiple converters, refining furnaces and tundishes, continuous casting machines and steel ladles [1,2]

  • The selection of the ladle of the heat is not regarded as the decision-making quantity, and the static scheduling problem of the production equipment is studied [5]

  • In steelmaking and continuous casting production processes, the starting time delay frequently occurs, which may lead to casting break or processing conflict

Read more

Summary

Introduction

Modern steelmaking and continuous casting production are composed of multiple converters, refining furnaces and tundishes (the container for holding molten steel; the capacity is approximately 1/3 of the capacity of the ladle), continuous casting machines and steel ladles [1,2]. Thereafter, the charge of molten steel is transported by a crane to a refining furnace. The molten steel is transported by a crane to a caster (a set of charges incessantly drained into a tundish of a continuous caster and solidifies in a crystalliser is called a cast). The selection of the ladle of the heat is not regarded as the decision-making quantity (the ladle is a part of the ladle refining furnace, which is equivalent to the refining equipment of the processing heat that is not fully arranged), and the static scheduling problem of the production equipment is studied [5]. The main reason is that the refining equipment for processing heat has not been fully arranged (lack of ladle options), and the transportation route has not been considered. Crane track CC converters refining furnaces continuous casting crane trolley trolley track

Research status of steelmaking–continuous casting ladle re-scheduling
Analysis of ladle scheduling problems
Modelling of the ladle re-scheduling problem
Symbol definition
Performance indicators
Post-cross conflict
Mixed conflict
Decision variables
Ladle optimal scheduling model
Background knowledge
B Based on the start-up time of heat to sort decisions
A Minimal generalisation rule learning method
B Evaluation and selection
A Learner selection
C Selection rules for decarburisation ladle
Ladle optimal scheduling algorithm
Findings
Conclusion