Abstract

London Underground Limited's Ladbroke Grove Station, constructed around 100 years ago, was displaying signs of structural damage. The brick platform walls appeared to have rotated outwards from the tracks and vertical cracks of up to 5 mm wide were visible. Investigation and monitoring works were undertaken and proposals were outlined for remedial works. A design and build contract was subsequently awarded for remedial works. The earlier remedial proposals were reconsidered at design in order to arrive at the optimum solution, resulting in the least disruption to passengers. This paper discusses how the final solution was derived, the construction works and the monitoring of their effectiveness.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.