Abstract

AbstractThis paper deals with the cross‐border section of the Lyon‐Turin Line, i.e. the 57.5 km long Mont Cenis Base Tunnel between Saint Jean de Maurienne in France and the Susa valley in Italy. Works at Saint Martin La Porte started in 2015 including the 9 km TBM excavation along the south tube of the base tunnel between the access adits of Saint Martin La Porte and La Praz. In order to assemble the TBM, a large underground cavern has been excavated at the end of the Saint Martin La Porte access adit. The size of this cavern, with a length of approximately 45 m, a span of 23 m and a height of 22.2 m, and the geological and geomechanical conditions in the Carboniferous Formation at a depth of about 600 m made this work a challenge. The excavation and support methods adopted are described, together with the rock mass conditions and the observed ground behaviour. The monitoring data obtained during excavation are briefly presented, including the works schedule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.