Abstract

Describes the LG-2 powerhouse and related installations now under construction in north-western Quebec by `Societe d'Energie de la Baie James', a subsidiary of Hydro-Quebec, which has the mandate to manage the construction of the La Grande Complex. All power generation facilities are described, as are the principal characteristics of major electrical and mechanical equipment and auxiliaries. Particular emphasis is given to the study which was performed to determine optimum unit size, to the criteria used to match the generator capacity to a varying turbine output, and to the unit service and station service systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.