Abstract
Objective Design and construction of 5.5 inch prototype downhole inspection tool and electronics module. Implement preliminary software acquisition and display module. Integrate hardware and software systems. Conduct operational field test (OFT). Technical Approach From the continuation of Phase 1 of this research, the lessons learned in Phase 1 (Bench Test Prototype) were incorporated into the design and construction of an operational field test instrument. Implementation of preliminary software acquisition and display of data along with integration into existing wireline systems operations accomplished the total systems requirements. Finally, operational field test on PRCI committee member wells provide verification that all components of the system operate and provide desired results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.