Abstract

Dams and Hydropower plants in the Balkan region, especially in the countries of Ex-Yugoslavia, are coming to a period were reconstruction works have to be considered, to prolong their operational period and to improve their performance. The following paper represents a sublimate of series of steps taken for reconstruction and performance improvement of a Dam Bottom Outlet Regulation Gate. As the standards back in those days were slightly different from todays, and the equipment manufacture was also different, the main challenge was to take certain steps, such as analytical calculation approach, numerical CFD and FEA simulations and also mechanical reconstruction works, to make scope of workflows on the hydraulic gate, to improve operational range, reduce lifting loads and improve gate vibrations. Numerical simulations of the outflow conditions of the bottom outlet were carried out, and later were proved with drone footage to observe the outflow pattern. Besides, full dry and wet test measurements were made before and after reconstruction works, where significant performance improvement of the gate operation was achieved.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.