Abstract

A knowledge‐based diagnosis model for PCM executing problems in Taiwan public construction is proposed by using a new fuzzy‐neural approach. The diagnosis model confirms the causalities of the critical executing problems. By inputting the fuzziness of semantic description of the problems in the design phase this model can deduce the corresponding influence of the problems in the construction phase. The gravity of the problem is measured by the specific lagging percentage of estimated pricing progress. Finally, the data is integrated into a database management system to facilitate application, so as to make this diagnosis model an efficient instrument for public construction management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.