Abstract

Iron and steel production process is a hybrid production process. The production schedule and production scheduling are out of control and disorder due to the 'asynchronous' connection of the production processes, which is difficult to solve in production management. This paper analyses the production mode of the hybrid flow enterprise, constructs the integrated control model and the knowledge network system model of the steel production process. By using network design and C# and Matlab mixed programming technology, a prototype of knowledge network system for steel production hybrid process based on B/S three tier architecture mode is implemented, and its effectiveness is verified by case simulation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call