Abstract

AbstractBased on the project team's knowledge activities in the knowledge chain, we analyse the knowledge management, develop a design structure matrix (DSM) model, and utilize the AIDER clustering to solve the cooperation problems caused by team members from different departments. By analysing the coupling relationship between team members' knowledge chains and clustering the knowledge activities with a high coupling degree, the project team's knowledge chain achieves integration. Finally, plugging the proposed method into a business case shows that the method can improve the project team's knowledge management performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.