Abstract

Rural networks are characterized by a low load density and high specific investment costs. This results in comparatively long periods for the extension or reconstruction of networks. In order to optimize the planning process described in this paper, the planning rules are elaborated for a distribution network, which extends over a period of 30 years. Network structures and planning criteria are derived from this principle. This forms the basis for a knowledge based planning system aimed at cutting down the work expended on engineering in the course of annual planning.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.