Abstract

PDF HTML XML Export Cite reminder Key Technology Research on Tie Replacement of Large Span Swallow Tie Arch Bridge DOI: 10.59238/j.pt.2017.06.004 Author: Affiliation: (1.Mianyang City Transportation Bureau,Mianyang 621000,China;2.Civil Engineering and Architecture College, Southwest University of Science and Technology,Mianyang 621000,China;3.Highway Planning Survey and Design Institute of Sichuan Provincial Communications Department,Chengdu 6100414,China;4.Mianyang Sichuanjiao Highway Planning, Survey and Design Co., Ltd,Mianyang 621000,China) Clc Number: U442.5 Fund Project: Article | Figures | Metrics | Reference | Related | Cited by | Materials | Comments Abstract:Tie arch bridges were built in large numbers in China in the 1990s, and many of them have to be replaced due to serious corrosion of the ties. Ful River Bridge in Mianyang City is a (46+202+46)m swallow type bollard arch bridge, the length of the bollard anchorage section is long and the bollard cannot be replaced directly. Taking the bollard replacement project of this bridge as an example, the key technologies of structural system conversion, temporary bollard and temporary support system setting of bollard replacement project were studied, and the construction points of bollard replacement project were introduced for the reference of similar bridge projects for reinforcement and maintenance. Reference Related Cited by

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call