Abstract

The structure of the networked integrated service system established on the basis of distributed component structure is expounded, and corresponding functional modules are designed according to each component feature. An index system of RPM process decision including goal layer, criterion layer and scheme layer is proposed. A new method for RPM process selection based on expert system and fuzzy synthesis evaluation is presented and the support system for RPM manufacture process selection is set up. Based on the analysis of process planning of RPM collaborative manufacture, different types of RPM process monitoring points are determined according to the time scale principle,which provides the theoretical basis for the process management and monitoring. The implementation of the networked service system verifies its capacity of supporting enterprises with the convenient and rapid remote development of new products.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call