Abstract

The Bund Tunnel is 14.27m in diameter. It is the first application of super diameter earth pressure balanced shield (EPBS) in China. There are many historical buildings along the construction line, and the minimum horizontal distance from the building to the tunnel side varies from 1.7m to 30m. Considering the importance of these historical buildings and the complicated construction processes, it is essential to adopt effective protection techniques to ensure safety during the tunnel construction. Three kinds of protection techniques are presented in this paper. Firstly, underground cut-off wall built by bored piles is used to separate the buildings and tunnel when the minimum horizontal distance from the building to the tunnel side is less than 5m. Secondly, the grouting reinforcement technique is adopted when the minimum clear distance is between 5m and 10m. Finally, if the minimum clear distance is larger than 10m, the optimized construction parameters are selected to reduce the influence induced by the EPBS excavation. The deformations of some typical buildings are monitored. The results of this project will be a useful reference for similar future projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.