Abstract
This article provides key questions to consider when planning and operating a small stream hydrometric station. Office planning components include defining hydrometric monitoring objectives; the availability of hydrometric expertise; resource availability; safety plans and standard operating procedures; equipment availability (hydrometric station installation and streamflow measurement); sampling frequency and data availability; permissions and permitting requirements; data processing, access, and archiving; and metadata requirements. Key parts of field-based hydrometric planning include site safety; site accessibility; flow variability; channel control features; flow containment, diversions and additions; low flow considerations; high flow considerations; flow measurement challenges in small streams; benchmarks and survey criteria; and public safety and vandalism. Theoverall goal of the article is to help non-professionals collect better hydrometric data and to highlight the varied planning aspects of typical hydrometric installations and operations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Confluence: Journal of Watershed Science and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.