Abstract

The EU fusion roadmap defines the development of a DEMO plant that achieves a long operation time and demonstrates tritium self-sufficiency and net electricity output. The pre-conceptual design phase will be concluded with a gate review in 2020. Eight key design integration issues have been identified as critical, either because the corresponding solution found in ITER is not suitable in DEMO or because the issues are DEMO-specific and not present in ITER. All of these will affect in their resolution the design and possibly the technology of several tokamak and plant systems or even the DEMO architecture: (i) Feasibility of wall protection limiters during plasma transients, (ii) integrated design of breeding blanket and ancillary systems, (iii) power exhaust taking advantage of advanced divertor configurations, (iv) tokamak architecture based on vertical blanket segments, (v) direct or indirect power conversion concept, (vi) configuration of plant systems in the tokamak building, (vii) feasibility of hydrogen separation in the torus vacuum pump and direct internal fuel recycling, and (viii) development of a reliable plasma scenario.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.