Abstract

AbstractIn the integrated environment of design-build (DB), design risk is transferred from the owner to the DB team. One significant challenge to DB projects is design liability. This study discus...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call