Abstract

The paper describes the history and reasoning which led to the contractors successful selection of a design for the design-and-build tender. Key features of the bridge and of the superstructure and substructure design processes are described. Reference is made to problems encountered and to the performance of the completed structure. (Author/TRRL)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call