Abstract

In Indonesia regularly occur climate change from the dry season to the rainy season every year. Increased development of community life means triggering change in land use is causing a shortage of open land as a catchment area. This leads to runoff and only a little rainwater that falls tanah.Hujan absorbed by the roof surface and ground houses could cause flooding. Especially in residential areas that have little existing land plants. To anticipate the occurrence of flooding, it is necessary to make infiltration wells on each housing residents. Infiltration wells serves to accommodate and absorb rainwater into the soil slowly. Based on data analysis and calculation according to SK SNI 03-2453-2002, can be determined recharge wells were circular with a diameter of one meter and a depth of 3 meters. Construction recharge wells that correspond according to the instructions Technical Implementation Procedures Drainage environmentally sound Settlement Region (2002) is a brick wall without plaster or brick red and given the holes in the walls. keyword : rain water , the flow of the surface , absorption wells

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.