Abstract

This research study exploiting of potency charge river alternatively resource of energi for the power station of hydro mini energy ( PLTMH). Case study the evaluated is Wai Bobot River which located in Countryside Fragon Enchain, District Of Field Jar Pate;Upstream, Sub-Province of Werinama Kab. Seram Bagian Timur. Power Station Of Hydro Mini Energy ( PLTMH) expected can be woke up by Local Government Of Sub- Province of Werinama Kab.Seram Bagian Timur to obtain;get energy capacities attached equal to 27 kW to 42 house and 0,514 kW to each;every house by exploiting Wai Bobot River. Dimension Building barricade PLTMH specified from pursuant to River Wai Bobot floods debit equal to Q= 55 m3 / det. Debit plan equal to 0,80 m3 / det obtained from result of direct measurement in field by considering various aspect for example : yielded energy, scheme of PLTMH, high fall, turbine operational and also defrayal of work of and civil of elektromekanikal lowest.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call