Abstract

Muara Enim – Lahat railway double track construction can optimise the passenger and freight transportation in South Sumatera. The objective of this study is to conduct railway double track operation concept analysis in order to obtain full concept of railway operation on this line. The result of this study become so important since it can be used for maintaining the optimisation steps of railway double track operation between Muara Enim – Lahat. This research was conducted by doing field survey and instantional survey to obtain primary and secondary data that is used as basic analysis of Muara Enim – Lahat railway track line operation. The key points included on this railway operation concept analysis are number of train per day, train length, maximum speed, station location, station function, station category, station type and activity, line capacity, and station layout.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.