Abstract

The use of precast concrete is planned on work structure tie beam, columns, beams, and slab for precast systems have the advantage in terms time and cost efficiency compared to conventional systems (cast in place) to reach the targets that have been planned by the government.The purpose is to find out the cost efficiency and time usage precast. The cost analysis was obtained from the multiplication of bill of quantity and the work volume. To find a network using the Precedence Diagram Method (PDM) which was processed through Microsoft Project 2007 software then arranged in Bar Chart. The Bar Chart was arranged in the S-Curve with Microsoft Excel 2007 software. From the calculations, total project cost is IDR 13,300,074,303.07 with the cost efficiency IDR 604,137,428.00 or 4.34% less than the conventional method and the duration is 214 days with the time efficiensy 86 workdays or 28.67% quicker than the conventional method.Keywords: pre-cast concrete, cost, time, efficiency

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.