Abstract
The technology of construction of mine shafts for the conditions of the Maly Kuibas deposit is presented. The dimensions of the cross-section of the mine shafts are selected. The parameters of drilling and blasting operations have been calculated. Selected equipment for drilling holes in the borehole and loading the blasted rock mass. The lifting parameters were determined, the ropes were selected, and the lifting machines were selected. The technological schemes and methods of construction of shafts are considered. Designs of mine headframes are proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.