Abstract

Aim: to propose a definition by the method of simulation of technical equipment and technological support of non-public use paths.
 Methods: methods of probability theory and mathematical statistics were used to achieve this goal.
 Results: as a result of processing empirical data using the Statistics application package, the sample mean, standard deviation and coefficient of variation were obtained. In the course of various experiments with the model of the functioning of the transport system, the necessary volumes of work for the development of promising volumes of work were determined: track development and the number of shunting locomotives.
 Conclusion: the determination of the necessary development of the railway infrastructure of other non-public routes can be carried out in the proposed order.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.