Abstract

Further prospects for the development of “Pioner” gold deposit are associated with the development of deep-seated ore bodies by an underground method. When assessing the bump hazard of proposed technological solutions for stripping and working out the pit reserves of the deposit and substantiating the safe working conditions, some comprehensive studies were carried out, including an analysis of the geological and geomechanical conditions of deposit's development, detailed study of the physical and mechanical properties of rocks and ores, investigation of the fracture tectonics of the deposit and stress and strain state of the rock massif of the deposit. The performed modeling of the geomechanical processes of the rock massif with the use of numerical methods made it possible to identify the safe parameters of the guarding safety pillars under the pit bottom, and also to identify areas and elements of rock structures characterized by a minimum margin of stability according to the criteria of the acting maximum compressive and tangential stresses after complete mining of ore bodies. Recommendations were developed on the rational order of mining of ore bodies and on effective ways to protect and maintain mine workings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.