Abstract

This paper proposes a joint planning model of electric vehicle (EV) charging swapping station (CSS) and energy hub (EH) in an integrated energy system (IES). Firstly, via the load analysis of endurance mileage and driving battery level for the of plug-in EVs (PEVs) and swapping taxies (STs), the EV load of CSS is obtained. Then, based on the CSS's internal structure and operating characteristics, the operating and configuring models of CSS are built. After that, we propose configuring models of various energy supply and storage equipment (ESSE) of EH, which fully considers the coupling between planning and operating of ESSEs. And then, the planning comprehensive cost is regarded as the objective, and a joint planning model of CSS and EH is developed. Afterwards, the joint planning model is solved by the CPLEX in this paper. Finally, and the feasibility and effectiveness of the proposed method are verified.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call