Abstract

Joint Optimization of Integrated Mixed Maintenance and Distributed Two-Stage Hybrid Flow-Shop Production for Multi-Site Maintenance Requirements

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call