Abstract
Facility layout and production planning, as two important phases during flexible production mode, have a significant effect on production efficiency and cost with the changing of consumer demand. Motivated by the problem, considering the integration between facility layout and production planning, this paper develops the model of flexible production process based on the Petri Net. The serial optimization approach combing reachability graph algorithm and search algorithm is designed to work out the problem. Then the flexible production planning and dynamic layout scheme are obtained sequentially. Finally, a case study is carried out to verify the validity and performance of the methodology.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.