Abstract

This paper deals with capacity design, production and preventive maintenance planning of a production system made of parallel leased machines. The production system must satisfy a random demand over a finite number of periods. The number of machines to be leased, the quantity to produce by each one and customer demand are variable. A joint optimization approach of a maintenance strategy and an economical production plan is developed by considering the influence of usage rates on the degradation of machines. Firstly, we determine a nearly optimal number of machines to be leased as well as the quantities to produce during each period. Secondly, given the obtained production plan, a periodic preventive maintenance policy with minimal repairs at failure is determined for each machine. Branch and bound and random exploration methods are used to obtain an optimal solution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call