Abstract
Multi-unit parallel production systems (MuPPSs) widely exist in many industry areas. A general requirement for the MuPPS is that each production system should continuously run and its downtime should be as short as feasible. For such systems, optimising preventive maintenance (PM) policy is crucial so that resources such as the number of spare units and that of repairmen can be optimally used. On this basis, this paper develops an optimal model jointly optimising the PM policy and the number of repairmen and spare units, for which the genetic algorithm is used to determine the optimal displacement sequence of spare units. According to the developed model, a real case study of a train working line is presented to demonstrate its necessity. Finally, the sensitivity analysis is conducted to assess the influence of some parameters on the optimal results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.