Abstract

Mixed model assembly systems (MMASs) can simultaneously manufacture multiple product variants and are developed to satisfy customers’ increasing desire for products with a high variety. This paper investigates the joint decision-making of production and maintenance policies in MMASs with delayed differentiation configurations, where common operations are performed before differentiated processes. The problem is formulated as a Markov Decision Process (MDP) problem that minimises the average cost per unit time. Monte Carlo simulation is used to evaluate the system performance measures (e.g. volume mix ratio, product quality) under the optimal policy. Numerical examples are presented to illustrate the structure of the optimal policy and the impact of different factors on the system performance in an MMAS that produces two types of product variants. Techniques that can potentially solve the problem in large-sized MMASs are also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.