Abstract

The agility and the reactivity of the emerging Industry 4.0 work paradigm will probably lead to work intensification. Hence, in order to ensure an effective and safe human machine systems, jobs scheduling must be addressed with consideration of human factors. Following this trend, this paper details a new integer programming model for jobs scheduling with consideration of worker fatigue and reliability. Using Greedy Randomized Adaptive Search Procedure (GRASP), this model can be used in real-time to support manufacturing execution system in Factories of the Future to achieve efficient and safe jobs scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.