Abstract

In this paper we consider the job shop scheduling problem under a discrete non-renewable resource constraint. We assume that jobs have arbitrary processing times and resource requirements and there is a unit supply of the resource at each time period. We develop an approximation algorithm for this problem and empirically test its effectiveness in finding the minimum makespan schedules.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.