Abstract

Flexibility, speed, and efficiency are major challenges for operations managers in today's knowledge-intensive organizations. Such requirements are converted into three production scheduling criteria: (a) minimize the impact of setup times in flexible production lines when moving from one product to another, (b) minimize number of tardy jobs, and (c) minimize overall production time, or makespan, for a given set of products or services. There is a wide range of solution methodologies for such NP-hard scheduling problems. While mathematical programming models provide optimal solutions, they become too complex to model for large scheduling problems. Simultaneously, heuristic approaches are simpler and very often independent of the problem size, but provide “good” rather than optimal solutions. This paper proposes and compares two alternative solutions: 0-1 mixed integer linear programming and genetic programming. It also provides guidelines that can be used by practitioners in the process of selecting the appropriate scheduling methodology.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.