Abstract

JET, the world’s largest operating tokamak with unique Be/W wall and tritium handling capability, completed a Deuterium-Tritium (D-T) campaign in 2021 (Maggi et al 29th Fusion Energy Conf.) following a decade of preparatory experiments, dedicated enhancements, technical rehearsals and training (Horton et al 2016 Fusion Eng. Des. 109–111 925). Operation with tritium raises significant technical, safety and scientific challenges not encountered in standard protium or deuterium operation. This contribution describes the tritium operational requirements, pulses and technical preparations, new operating procedures, lessons learned and details on the achieved operational availability and performance. The preparation and execution of the recent JET tritium experiments benefitted from the previous experience in 1991 (Preliminary Tritium Experiment), 1997 (DTE1 campaign) and 2003 (Trace Tritium Campaigns) and consisted of the following five phases: technical rehearsals and scenario preparation, tritium commissioning, 100% tritium campaign, D-T campaign (DTE2), tritium clean-up. Following the clean-up JET resumed normal operation and is currently undertaking a further D-T campaign (DTE3).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.