Abstract

High-temperature superconducting (HTS) power cable has significant merits of compactness and large power transmission capacity. To evaluate its performance, safety and reliability, HTS cable system was constructed at Tokyo Electric Power Company's Asahi substation in Yokohama, and the HTS cable had been connected to a real grid from October 29, 2012 to December 25, 2013 for the first time in Japan. The in-grid operation had continued for more than one year without any accidental interruption of the operation or troubles of the system. It is concluded that the HTS cable system has good performance and stability for long term in-grid operation. This paper describes the result of the HTS cable demonstration and their characteristics.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.