Abstract

Numerous bridges have to be lifted to meet increased navigation capacity. However, no relevant technical standard for the jack-up technique is yet available. This paper presents a study on the integral lifting of simply supported girder bridge which implements the finite element method. Finite element analysis provides a reliable basis in controlling construction. Research shows that stress concentration is evident near support points in the lifting process. Thus, stress monitoring is necessary. These points should be near to the bridge web. Moreover, beam span and section rigidity should also be considered when jacking up a bridge. The value of allowable error in the jacking-up process decreases with increasing beam span or decreasing section stiffness. Therefore, jacking up a bridge will be safer when section rigidity is large enough and beam span is not extremely long. This paper offers tremendous reference value with regard to engineering projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.