Abstract

We present an Iterated Local Search (ILS) algorithm for solving the single-machine scheduling problem with sequence-dependent setup times to minimize the total weighted tardiness. The proposed ILS algorithm exhibits several distinguishing features, including a new neighborhood structure called Block Move and a fast incremental evaluation technique, for evaluating neighborhood solutions. Applying the proposed algorithm to solve 120 public benchmark instances widely used in the literature, we achieve highly competitive results compared with a recently proposed exact algorithm and five sets of best solutions of state-of-the-art metaheuristic algorithms in the literature. Specifically, ILS obtains the optimal solutions for 113 instances within a reasonable time, and it outperforms the previous best-known results obtained by metaheuristic algorithms for 34 instances and matches the best results for 82 instances. In addition, ILS is able to obtain the optimal solutions for the remaining seven instances under a relaxed time limit, and its computational efficiency is comparable with the state-of-the-art exact algorithm by Tanaka and Araki (Comput Oper Res 40:344---352, 2013). Finally, on analyzing some important features that affect the performance of ILS, we ascertain the significance of the proposed Block Move neighborhood and the fast incremental evaluation technique.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.