Abstract

This paper describes the following contracting concepts applicable to tunnelling and other underground construction work: Design-Bid-Build; Partial Design-Construct or Partial Design-Build; Design-Build and Turnkey; and Build-Operate-Transfer. Advantages, disadvantages, and related risks are summarized for each type of contract. Aspects of multiple construction contracts and contracting with an association of contractors are addressed. The three main methods of pricing—lump-sum, cost-reimbursable, and unit-price—are discussed in detail. Other aspects of compensation, such as bonus payments, currency of price, adjustment and revision of price, and payment conditions, are also addressed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.