Abstract

By following the development of the market and the needs of the community, it is increasingly needed a technology to improve the quality and results of its production with careful planning, in order to avoid the level of loss and reduce production in the company. This is experienced by companies UD. Muria PS who is engaged in animal husbandry. Which has several problems in scheduling employees to take their products. Which also has an impact on the gap between employees on the bonus wages they receive. By building a scheduling information system and providing bonus wages, this research uses php programming language and website-based programming and applies genetic algorithms in it to more easily manage employee schedules and provide bonus rewards fairly and evenly. This genetic algorithm process has a parameter of the vehicle, coolie, and time in the scheduling process. and schedule parameters in the employee bonus wage process. Based on the results of the user trial, the respondents strongly agree with the existence of this application. Which of the 14 respondents said it was feasible to apply to the company UD. Muria PS with a result of 87.37%. It is expected that with this application, employee scheduling and bonus wage issues can help solve it. Keywords: Scheduling, Bonus Salary, Genetic Algorithm, PHP

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.