Abstract

Fillability of a schedule, down time of trains, quality of a schedule, the use of train paths, reduction of operating costs, train paths, distribution of trains. The problem of reduction of operating costs for the train traffic between technical stations is considered. The analysis of the use of a train schedule is made in this paper. The dependence of operating costs on the route speed, the quality of a schedule and its fillability is established. A solution to the problem of improving the quality of filling the schedule, expressed in the use of train paths of certain categories (direct, or having a stop on the section between the technical stations) is proposed. A method for determining the down time of trains at technical stations is proposed, depending on the fillability of a schedule. The forecast of the change in the main operating indicators and operating costs for the application of the proposed technology for the departure of trains was made.

Highlights

  • The problem of making the optimal schedule for the train traffic, which makes it possible to link the work of all the railway units, is on the agenda throughout the entire existence of the railway transport

  • On the basis of the data obtained, it can be concluded that the increase in route speed leads to a reduction in costs. It can be seen from the graph above that when the route speed is increased by 8.6% of the minimum value, the operating costs are reduced by 17%

  • Effective use of the existing train traffic schedule leads to an increase in operating costs

Read more

Summary

Introduction

The problem of making the optimal schedule for the train traffic, which makes it possible to link the work of all the railway units, is on the agenda throughout the entire existence of the railway transport. The problem of the economic efficiency of the train traffic schedule is of a great importance. One of the examples of realization of the idea of economically optimal schedule is the “Elbrus” system. There are a number of unsolved problems in the field of schedule optimization at the moment

Increasing the speed of trains will significantly reduce operating costs
Impact of schedule fillability on the down time of a car at service station
Increasing operational indicators
Findings
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.