Abstract

Knowledge management (KM) in project-based organizations has received substantial attention in recent years, as knowledge processes are insufficiently supported within the organization as a whole. This study specifically focuses on the project actor’s role in managing knowledge. From an actor’s perspective, the problems raised by knowledge embeddedness are identified as a key issue to link project knowledge and organizational knowledge. A conceptual framework is developed that addresses three different aspects of knowledge embeddedness: a relational dimension, a temporal dimension and a structural dimension. Three cases are studied, covering varying forms of organizations in different areas (a consulting firm, an R&D department and an industrial business unit). The results concerning the relational dimension indicate that project actors re-build the network of relationships supporting knowledge. Regarding the temporal dimension, and specifically in their professional field, actors frame professional knowledge related to their project experience. However, actors fail to surmount the problems raised by the structural dimension of knowledge embeddedness. The resulting recommendations for KM concern both Human Resource Management practices and organizational design.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.